Schneider Electric Canada-Tenant Fit Out
Groen Environmental Systems
Timeline – 6 months
This was a complete renovation of a six story office building that needed to be retrofitted to accommodate new office and testing facilities for Schneider Electric. This included completely upgrading the distribution, lighting, branch wiring, and lighting controls though-out the entire building. We also upgraded the fire alarm system, added a new structured cabling system, sound masking. We were also required to install control wiring and specialized connections to custom testing equipment. This was all done on an accelerated schedule.