Schneider Electric Canada-Tenant Fit Out

Groen Environmental Systems

Timeline – 6 months

This was a complete renovation of a six story office building that needed to be retrofitted to accommodate new office and testing facilities for Schneider Electric. This included completely upgrading the distribution, lighting, branch wiring, and lighting controls though-out the entire building. We also upgraded the fire alarm system, added a new structured cabling system, sound masking. We were also required to install control wiring and specialized connections to custom testing equipment. This was all done on an accelerated schedule.

 

Project Details
  • Completed 2011
Recent Portfolio

Via Rail

Service contract : Vancouver

Maintaining all of their electrical needs for their buildings

Olympic Village

Architectural design : Vancouver

Architectural design & Exterior Lighting

Air Products

New Construction : Burnaby

Gas testing & development laboratory.

Schneider Electric

New Construction : Burnaby

One of the largest grid support and solar inverter test lab in the world.